rsos180346_si_001.doc (9.7 MB)
Jinwen Bai_Figures_ESM.doc from Vertical stress and stability of interburden over abandoned pillar working before upward mining: a case study
journal contribution
posted on 2018-07-19, 18:47 authored by Jinwen Bai, Guorui Feng, Shanyong Wang, Tingye Qi, Jian Yang, Jun Guo, Zhen Li, Xianjie Du, Zehua Wang, Yunlou Du, Yujiang ZhangAll figures in the revised manuscript